Can anyone point me to some Java snippet wherein i can get business (except Sat and Sun) days between two dates.
-
1http://joda-time.sourceforge.net/ – moinudin Jan 05 '11 at 01:24
-
1**To future readers**: this question was asked in 2011, before Java 8 existed, which ships with an implementation of [JSR 310](https://jcp.org/aboutJava/communityprocess/pfd/jsr310/JSR-310-guide.html). Many answers here use the `Calendar` class – but this class is obsolete. Use classes from the [`java.time`](https://docs.oracle.com/en/java/javase/14/docs/api/java.base/java/time/package-summary.html) package instead. [This answer is an elegant solution](https://stackoverflow.com/a/51010738/507738) using `java.time`. – MC Emperor Nov 11 '20 at 10:54
21 Answers
public static int getWorkingDaysBetweenTwoDates(Date startDate, Date endDate) {
Calendar startCal = Calendar.getInstance();
startCal.setTime(startDate);
Calendar endCal = Calendar.getInstance();
endCal.setTime(endDate);
int workDays = 0;
//Return 0 if start and end are the same
if (startCal.getTimeInMillis() == endCal.getTimeInMillis()) {
return 0;
}
if (startCal.getTimeInMillis() > endCal.getTimeInMillis()) {
startCal.setTime(endDate);
endCal.setTime(startDate);
}
do {
//excluding start date
startCal.add(Calendar.DAY_OF_MONTH, 1);
if (startCal.get(Calendar.DAY_OF_WEEK) != Calendar.SATURDAY && startCal.get(Calendar.DAY_OF_WEEK) != Calendar.SUNDAY) {
++workDays;
}
} while (startCal.getTimeInMillis() < endCal.getTimeInMillis()); //excluding end date
return workDays;
}
Start date and end date are exclusive, Only the days between given dates will be counted. Start date and end date will not be included.

- 21,688
- 25
- 143
- 191

- 15,454
- 6
- 47
- 56
-
Got some strange answers if startDate is on or after endDate. If startDate is 1970-01-01 21:27:00 and endDate is 1970-01-01 18:00:00, the function returns 1 instead of 0 days between the same date. Also if startDate is 2011-01-05 21:27:00 and endDate is 2011-01-04 00:00:00 the function returns 2 instead of -1 or 1 (if absolute values are expected). – Joseph Gordon Jan 05 '11 at 22:43
-
1The above code snippet is meant for calculating working days between two dates without time. – Piyush Mattoo Jan 06 '11 at 04:26
-
7
-
2To include startdate place the startCal.add(Calendar.DAY_OF_MONTH,1) after the if condition. – Harish Nov 27 '15 at 06:49
-
FYI, the troublesome old date-time classes such as [`java.util.Date`](https://docs.oracle.com/javase/10/docs/api/java/util/Date.html), [`java.util.Calendar`](https://docs.oracle.com/javase/10/docs/api/java/util/Calendar.html), and `java.text.SimpleDateFormat` are now [legacy](https://en.wikipedia.org/wiki/Legacy_system), supplanted by the [*java.time*](https://docs.oracle.com/javase/10/docs/api/java/time/package-summary.html) classes built into Java 8 and later. See [*Tutorial* by Oracle](https://docs.oracle.com/javase/tutorial/datetime/TOC.html). – Basil Bourque Jun 25 '18 at 20:39
Solution without loop:
static long days(Date start, Date end){
//Ignore argument check
Calendar c1 = Calendar.getInstance();
c1.setTime(start);
int w1 = c1.get(Calendar.DAY_OF_WEEK);
c1.add(Calendar.DAY_OF_WEEK, -w1);
Calendar c2 = Calendar.getInstance();
c2.setTime(end);
int w2 = c2.get(Calendar.DAY_OF_WEEK);
c2.add(Calendar.DAY_OF_WEEK, -w2);
//end Saturday to start Saturday
long days = (c2.getTimeInMillis()-c1.getTimeInMillis())/(1000*60*60*24);
long daysWithoutWeekendDays = days-(days*2/7);
// Adjust days to add on (w2) and days to subtract (w1) so that Saturday
// and Sunday are not included
if (w1 == Calendar.SUNDAY && w2 != Calendar.SATURDAY) {
w1 = Calendar.MONDAY;
} else if (w1 == Calendar.SATURDAY && w2 != Calendar.SUNDAY) {
w1 = Calendar.FRIDAY;
}
if (w2 == Calendar.SUNDAY) {
w2 = Calendar.MONDAY;
} else if (w2 == Calendar.SATURDAY) {
w2 = Calendar.FRIDAY;
}
return daysWithoutWeekendDays-w1+w2;
}

- 9,693
- 3
- 25
- 35

- 31,208
- 22
- 85
- 130
-
Really impressed with your solution. I was trying to accomplish the same thing but wound up with switches to catch the beginning and end dates on the weekend instead of doing the date shifting. This is much more elegant. – Joseph Gordon Jan 05 '11 at 05:31
-
@Shengyuan : I know it's a bit late now, but could you please explain the last 2 lines: `long days = (c2.getTimeInMillis()-c1.getTimeInMillis())/(1000*60*60*24);` `long daysWithoutSunday = days-(days*2/7);` – Vrushank May 27 '12 at 06:05
-
First line is total date count between start date and end date. Second line is total date count minus weekend count. – iceberg Oct 09 '15 at 13:56
-
Inconsistent results: Between 2018-03-09 and 2018-03-10 (Friday and Saturday) yields 0 days. Between 2018-03-09 and 2018-03-11 (Friday and Sunday) yields 1 days. – Roland Mar 03 '18 at 15:18
-
Solution without loop in 5 lines of code
Days between are defined in the same way as ChronoUnit.DAYS.between(start, end)
which means there are 4
days between Monday and Friday. Since we are only interested in weekdays we have to subtract weekends, therefore from Friday until Tuesday there will be 2
weekdays(just compute endDay - startDay
and subtract 2
for the weekend). Add 1
to the result if you want an inclusive result, i.e. not days between.
I present two solutions.
First solution (5-liner, short and cryptic):
import java.time.*;
import java.time.temporal.*;
public static long calcWeekDays1(final LocalDate start, final LocalDate end) {
final DayOfWeek startW = start.getDayOfWeek();
final DayOfWeek endW = end.getDayOfWeek();
final long days = ChronoUnit.DAYS.between(start, end);
final long daysWithoutWeekends = days - 2 * ((days + startW.getValue())/7);
//adjust for starting and ending on a Sunday:
return daysWithoutWeekends + (startW == DayOfWeek.SUNDAY ? 1 : 0) + (endW == DayOfWeek.SUNDAY ? 1 : 0);
}
Second solution:
public static long calcWeekDays2(final LocalDate start, final LocalDate end) {
final int startW = start.getDayOfWeek().getValue();
final int endW = end.getDayOfWeek().getValue();
final long days = ChronoUnit.DAYS.between(start, end);
long result = days - 2*(days/7); //remove weekends
if (days % 7 != 0) { //deal with the rest days
if (startW == 7) {
result -= 1;
} else if (endW == 7) { //they can't both be Sunday, otherwise rest would be zero
result -= 1;
} else if (endW < startW) { //another weekend is included
result -= 2;
}
}
return result;
}

- 7,525
- 13
- 61
- 124
-
2If both start and end date falls on Saturday, or both on Sunday, then it gives wrong result. – shanti Feb 25 '18 at 12:53
-
2
-
1@Roland Thanks for the answer, I've used it to calculate weekend days between dates in PHP - https://stackoverflow.com/a/54697180/1213655 – Pratyush Feb 14 '19 at 18:47
-
Does the first solution give the right result if start day is Friday and end day is Sunday? – PentiumPro200 Sep 27 '20 at 19:42
-
-
@Roland - It gives 1. I guess that is correct based on ChronoUnit's definition of between. I was earlier thinking that days between excludes both the start and end day. For example, the number of days between Monday and Wednesday would be 1, not 2. But I guess it's actually 2 according to ChronoUnit's definition. – PentiumPro200 Sep 30 '20 at 19:06
java.time
The modern way is with the java.time classes.
LocalDate
The LocalDate
class represents a date-only value without time-of-day and without time zone.
LocalDate start = LocalDate.of( 2016 , 1 , 23 );
LocalDate stop = start.plusMonths( 1 );
DayOfWeek
enum
The DayOfWeek
enum provides a singleton instance for each of the sever days of the week.
DayOfWeek dow = start.getDayOfWeek();
if( dow.equals( DayOfWeek.SATURDAY ) || dow.equals( DayOfWeek.SUNDAY ) ) …
We can collect the desired dates in a List
.
int initialCapacity = Duration.between( start , stop ).toDays() ;
List<LocalDate> dates = new ArrayList<>( initialCapacity );
…
if( dow.equals( DayOfWeek.SATURDAY ) || dow.equals( DayOfWeek.SUNDAY ) ) {
dates.add( date );
…
An EnumSet
is an extremely efficient, fast and low-memory, implementation of Set
. We can use an EnumSet
instead of the if
statement seen above.
Set<DayOfWeek> weekend = EnumSet.of( DayOfWeek.SATURDAY , DayOfWeek.SUNDAY ) ;
…
if( weekend.contains( dayOfWeek ) ) …
Put that all together.
LocalDate date = start ;
while( date.isBefore( stop ) ) {
if( ! weekend.contains( date.getDayOfWeek() ) ) { // If not weekend, collect this LocalDate.
dates.add( date ) ;
}
// Prepare for next loop.
date = date.plusDays( 1 ); // Increment to next day.
}
nextWorkingDay
TemporalAdjuster
Another approach uses the ThreeTen-Extra project to add classes that work with java.time.
The Temporals
class adds additional implementations of TemporalAdjuster
for manipulating date-time values. We want the nextWorkingDay
adjuster to increment the date while skipping over Saturday & Sunday.
LocalDate start = LocalDate.of( 2016 , 1 , 23 );
LocalDate stop = start.plusMonths( 1 );
int initialCapacity = Duration.between( start , stop ).toDays() ;
List<LocalDate> dates = new ArrayList<>( initialCapacity );
LocalDate date = start.minusDays( 1 ); // Start a day ahead.
while( date.isBefore( stop ) ) {
date = date.with( org.threeten.extra.Temporals.nextWorkingDay() );
// Double-check ending date as the `nextWorkingDay` adjuster could move us past the stop date.
if( date.isBefore( stop ) ) {
dates.add( date ) ;
}
}
Performance
I am curious about the performance of the various approach in various Answers on this page. I am considering only the modern java.time code, not the code using troublesome legacy Date
/Calendar
classes.
Here are four methods that each return the number of days elapsed.
One uses the clever math-based approach seen in the Answer by Roland.
private long countWeekDaysMath ( LocalDate start , LocalDate stop ) {
// Code taken from Answer by Roland.
// https://stackoverflow.com/a/44942039/642706
long count = 0;
final DayOfWeek startW = start.getDayOfWeek();
final DayOfWeek stopW = stop.getDayOfWeek();
final long days = ChronoUnit.DAYS.between( start , stop );
final long daysWithoutWeekends = days - 2 * ( ( days + startW.getValue() ) / 7 );
//adjust for starting and ending on a Sunday:
count = daysWithoutWeekends + ( startW == DayOfWeek.SUNDAY ? 1 : 0 ) + ( stopW == DayOfWeek.SUNDAY ? 1 : 0 );
return count;
}
Two use approaches seen in this Answer of mine: (a) Visit each date, incrementing one-by-one in a conventional loop.
private long countWeekDaysVisit ( LocalDate start , LocalDate stop ) {
// Code taken from Answer by Basil Bourque.
// https://stackoverflow.com/a/40369140/642706
long count = 0;
Set < DayOfWeek > weekend = EnumSet.of( DayOfWeek.SATURDAY , DayOfWeek.SUNDAY );
LocalDate ld = start;
while ( ld.isBefore( stop ) ) {
if ( ! weekend.contains( ld.getDayOfWeek() ) ) { // If not weekend, collect this LocalDate.
count++;
}
// Prepare for next loop.
ld = ld.plusDays( 1 ); // Increment to next day.
}
return count;
}
…and, (b) Using the TemporalAdjuster
implementation org.threeten.extra.Temporals.nextWorkingDay()
.
private long countWeekDaysAdjuster ( LocalDate start , LocalDate stop ) {
// Code taken from Answer by Basil Bourque.
// https://stackoverflow.com/a/40369140/642706
long count = 0;
Set < DayOfWeek > weekend = EnumSet.of( DayOfWeek.SATURDAY , DayOfWeek.SUNDAY );
TemporalAdjuster nextWorkingDayTA = org.threeten.extra.Temporals.nextWorkingDay();
LocalDate ld = start;
if ( weekend.contains( ld.getDayOfWeek() ) ) {
ld = ld.with( nextWorkingDayTA );
}
while ( ld.isBefore( stop ) ) {
count++;
// Prepare for next loop.
ld = ld.with( nextWorkingDayTA ); // Increment to next working day (non-weekend day).
}
return count;
}
The last uses Java Streams approach seen in the Answer by Ravindra Ranwala.
private long countWeekDaysStream ( LocalDate start , LocalDate stop ) {
// Code taken from the Answer by Ravindra Ranwala.
// https://stackoverflow.com/a/51010738/642706
long count = 0;
Set < DayOfWeek > weekend = EnumSet.of( DayOfWeek.SATURDAY , DayOfWeek.SUNDAY );
final long weekDaysBetween = start.datesUntil( stop )
.filter( d -> ! weekend.contains( d.getDayOfWeek() ) )
.count();
return count;
}
And the test harness.
Caveats:
- Well, the usual caveats about micro-benchmarking being untrustworthy, prone to unjustified or unrealistic conclusions.
- I wish I'd learned to use the JMH micro-benchmarking framework.
- I have not bothered to try optimizing any of this code. For example, in real work, the
TemporalAdjuster
could be cached outside our method.
Test harness.
LocalDate start = LocalDate.of( 2018 , Month.JANUARY , 1 );
LocalDate stop = start.plusYears( 1 );
int runs = 100_000;
long go = System.nanoTime();
for ( int i = 1 ; i <= runs ; i++ ) {
long count = this.countWeekDaysMath( start , stop );
}
long elapsedMath = ( System.nanoTime() - go );
go = System.nanoTime();
for ( int i = 1 ; i <= runs ; i++ ) {
long count = this.countWeekDaysVisit( start , stop );
}
long elapsedVisit = ( System.nanoTime() - go );
go = System.nanoTime();
for ( int i = 1 ; i <= runs ; i++ ) {
long count = this.countWeekDaysStream( start , stop );
}
long elapsedAdjuster = ( System.nanoTime() - go );
go = System.nanoTime();
for ( int i = 1 ; i <= runs ; i++ ) {
long count = this.countWeekDaysStream( start , stop );
}
long elapsedStream = ( System.nanoTime() - go );
System.out.println( "math: " + elapsedMath + " each: " + ( elapsedMath / runs ) );
System.out.println( "visit: " + elapsedVisit + " each: " + ( elapsedVisit / runs ) );
System.out.println( "adjuster: " + elapsedAdjuster + " each: " + ( elapsedAdjuster / runs ) );
System.out.println( "stream: " + elapsedStream + " each: " + ( elapsedStream / runs ) );
When run on my MacBook Pro (Sierra) with Oracle JDK 10.0.1 and ThreeTen-Extra version 1.3.2, I get results consistently close to the following. The math solution is a tiny fraction of the others at a couple hundred nanos versus several thousand, as we would expect obviously. Of the other three, the TemporalAdjuster
is the longest, always over 10,000 nanos each. The visit and stream both come in well under that 10,000 nanos each, with visit being noticeably faster than streams. As seen in other examples around the internets, Java Streams usually make for nifty short code while often running significantly longer, about 20% longer in this case.
math: 18313309 each: 183
visit: 708420626 each: 7084
adjuster: 1002157240 each: 10021
stream: 924724750 each: 9247
About java.time
The java.time framework is built into Java 8 and later. These classes supplant the troublesome old legacy date-time classes such as java.util.Date
, Calendar
, & SimpleDateFormat
.
The Joda-Time project, now in maintenance mode, advises migration to java.time.
To learn more, see the Oracle Tutorial. And search Stack Overflow for many examples and explanations. Specification is JSR 310.
Where to obtain the java.time classes?
- Java SE 8 and SE 9 and later
- Built-in.
- Part of the standard Java API with a bundled implementation.
- Java 9 adds some minor features and fixes.
- Java SE 6 and SE 7
- Much of the java.time functionality is back-ported to Java 6 & 7 in ThreeTen-Backport.
- Android
- The ThreeTenABP project adapts ThreeTen-Backport (mentioned above) for Android specifically.
- See How to use….
The ThreeTen-Extra project extends java.time with additional classes. This project is a proving ground for possible future additions to java.time. You may find some useful classes here such as Interval
, YearWeek
, YearQuarter
, and more.

- 4,416
- 1
- 27
- 41

- 303,325
- 100
- 852
- 1,154
-
instead of `LocalDate date = start ;`, why not `LocalDate date = LocalDate.from(start)` to avoid mutating the argument? – Simon May 09 '18 at 16:36
-
1@Simon The *java.time* classes are [immutable](https://en.m.wikipedia.org/wiki/Immutable_object), by design. – Basil Bourque May 09 '18 at 18:50
-
Feel like this answer deserves more recognition. The first approach is more readable than the accepted answer and works just as well. – Bartek Spitza Jun 20 '19 at 14:42
I used Shengyuan Lu's solution, but I needed to make a fix for the case where the method is called when one of the dates is on a Saturday and the other a Sunday - otherwise the answer is off by a day:
static long days(Date start, Date end){
//Ignore argument check
Calendar c1 = GregorianCalendar.getInstance();
c1.setTime(start);
int w1 = c1.get(Calendar.DAY_OF_WEEK);
c1.add(Calendar.DAY_OF_WEEK, -w1 + 1);
Calendar c2 = GregorianCalendar.getInstance();
c2.setTime(end);
int w2 = c2.get(Calendar.DAY_OF_WEEK);
c2.add(Calendar.DAY_OF_WEEK, -w2 + 1);
//end Saturday to start Saturday
long days = (c2.getTimeInMillis()-c1.getTimeInMillis())/(1000*60*60*24);
long daysWithoutSunday = days-(days*2/7);
if (w1 == Calendar.SUNDAY) {
w1 = Calendar.MONDAY;
}
if (w2 == Calendar.SUNDAY) {
w2 = Calendar.MONDAY;
}
return daysWithoutSunday-w1+w2;
}

- 347
- 3
- 7
Almost all the solutions are pretty much obsoleted and narrative. However here's a much condensed and readable solution.
This approach uses a Java Stream provided by the LocalDate::datesUntil
method built into in Java 9 and later.
LocalDate startDate = LocalDate.of(2018, 5, 2);
LocalDate endDate = LocalDate.now();
Set<DayOfWeek> weekend = EnumSet.of(DayOfWeek.SATURDAY, DayOfWeek.SUNDAY);
final long weekDaysBetween = startDate.datesUntil(endDate)
.filter(d -> !weekend.contains(d.getDayOfWeek()))
.count();
.datesUntil
returns a sequential ordered stream of dates. The returned stream starts from this date (inclusive) and goes to endExclusive (exclusive) by an incremental step of 1 day.
Then all the Saturdays and Sundays are filtered out. Final step is to get the count of the remaining week days.
Java-9 has been released one year ago, since using it now seems reasonable to me.

- 20,744
- 6
- 45
- 63
-
1I like this Answer for the simplest and shortest code. But this is likely the slowest: (A) every date is being considered, whereas some other Answers were trying to be clever in calculating the total without visiting each date. (B) Java Steams are often slower than alternate code, sometimes by many fold. So if using large amounts of data or running often, test for performance. Otherwise I would use this approach for small amounts of data ran less often. – Basil Bourque Jun 24 '18 at 18:55
-
@BasilBourque I agree with you up to certain extent. Yes this solution considers every date. But this approach is much more parallel friendly. So, we can gain the parallel speedup by executing it in parallel if needed. – Ravindra Ranwala Jun 25 '18 at 02:14
-
1Parallelizing across cores shortens elapsed time of execution (wall-clock time) but does *not* reduce the burden on the CPU, assuming you have cores available at runtime. Indeed, parallelizing *adds* to CPU burden, for the overhead of coordinating the parallel work. – Basil Bourque Jun 25 '18 at 21:27
-
1This thread caught my curiosity. So I tried out your Java Streams approach against Roland’s math-based approach, and my two approaches visiting each date and using a `TemporalAdjuster`. Roland's math wins by a long shot, of course, without comparison. Your Streams approach is about 20% slower than visiting each date in a conventional loop. But my `TemporalAdjuster` approach was always the slowest. See all my code and results in "Performance" section added to [my Answer](https://stackoverflow.com/a/40369140/642706). – Basil Bourque Jun 25 '18 at 21:27
-
@BasilBourque Yes, parallel execution takes more CPU cycles to compute the result faster. However that was a great benchmark. – Ravindra Ranwala Jun 26 '18 at 02:11
-
What is the asymptotic complexity of that math based approach? Mine is `Θ(n)`. – Ravindra Ranwala Feb 25 '21 at 04:53
This thread is filled with failing solutions... I started by writing a little test file which met my needs, and saw that Roland's both solutions fails, Amir's too. I wanted a solution that uses java 8 and that does not uses loops because, do I have to say why ?
So here's the test file :
@Test
public void test() {
LocalDate d1 = LocalDate.of(2018, 8, 1);
LocalDate d2 = LocalDate.of(2018, 8, 2);
LocalDate d3 = LocalDate.of(2018, 8, 3);
LocalDate d4 = LocalDate.of(2018, 8, 4);
LocalDate d5 = LocalDate.of(2018, 8, 5);
LocalDate d6 = LocalDate.of(2018, 8, 6);
LocalDate d7 = LocalDate.of(2018, 8, 7);
LocalDate d8 = LocalDate.of(2018, 8, 8);
LocalDate d9 = LocalDate.of(2018, 8, 9);
LocalDate d10 = LocalDate.of(2018, 8, 10);
LocalDate d15 = LocalDate.of(2018, 8, 15);
LocalDate dsep = LocalDate.of(2018, 9, 5);
// same day : 0 days between
Assert.assertEquals(0, DateUtils.calcWeekDays1(d1, d1));
Assert.assertEquals(1, DateUtils.calcWeekDays1(d1, d2));
Assert.assertEquals(2, DateUtils.calcWeekDays1(d1, d3));
// end on week-end
Assert.assertEquals(2, DateUtils.calcWeekDays1(d1, d4));
Assert.assertEquals(2, DateUtils.calcWeekDays1(d1, d5));
// next week
Assert.assertEquals(3, DateUtils.calcWeekDays1(d1, d6));
Assert.assertEquals(4, DateUtils.calcWeekDays1(d1, d7));
Assert.assertEquals(5, DateUtils.calcWeekDays1(d1, d8));
Assert.assertEquals(6, DateUtils.calcWeekDays1(d1, d9));
Assert.assertEquals(7, DateUtils.calcWeekDays1(d1, d10));
// start on saturday
Assert.assertEquals(0, DateUtils.calcWeekDays1(d4, d5));
Assert.assertEquals(0, DateUtils.calcWeekDays1(d4, d6));
Assert.assertEquals(1, DateUtils.calcWeekDays1(d4, d7));
// start on sunday
Assert.assertEquals(0, DateUtils.calcWeekDays1(d5, d5));
Assert.assertEquals(0, DateUtils.calcWeekDays1(d5, d6));
Assert.assertEquals(1, DateUtils.calcWeekDays1(d5, d7));
// go to next week
Assert.assertEquals(10, DateUtils.calcWeekDays1(d1, d15));
// next month
Assert.assertEquals(25, DateUtils.calcWeekDays1(d1, dsep));
// start sat, go to next month
Assert.assertEquals(22, DateUtils.calcWeekDays1(d4, dsep));
}
And here is my proposed solution, quite simple. Just let java count the number of weeks, multiply by five, and add the number of days needed to compensate the difference ; the only trick is adjusting the start and end to avoid week-ends :
public static long calcWeekDays1(LocalDate start, LocalDate end) {
if (start.getDayOfWeek().getValue() > 5) {
start = start.with(TemporalAdjusters.next(DayOfWeek.MONDAY));
}
if (end.getDayOfWeek().getValue() > 5) {
end = end.with(TemporalAdjusters.previous(DayOfWeek.FRIDAY));
}
if (start.isAfter(end)) { // may happen if you start sat. and end sunday
return 0;
}
long weeks = ChronoUnit.WEEKS.between(start, end);
if (start.getDayOfWeek().getValue() > end.getDayOfWeek().getValue()) {
weeks += 1;
}
return 5 * weeks + end.getDayOfWeek().getValue() - start.getDayOfWeek().getValue();
}
And now I will look stupid if my code fails too :)

- 73
- 5
-
Like you said, any other code have some strange fails. I rewrote this code using java 7 and this algorithm worked, thanks. – Kosonome Dec 30 '19 at 18:34
-
I went ahead and added these tests to my suite and they (as well as many others) all work. The algorithm expects inclusive date intervals though, e.g. there are 5 days "between" Monday and Friday. Also, here's a formal proof that the algorithm works: https://amir.a-ware.dev/calculating-the-number-of-specific-weekdays-between-two-dates.html#calculating-the-number-of-specific-weekdays-between-two-dates. – Amir Kadić Jan 27 '21 at 13:36
-
Hi @AmirKadić, thanks for your input. I went ahead too and tested again your code, with the same results : these tests don't pass. They all yield one more than my code, except the two tests after "start on saturday" and "start on sunday" which yield 0 like my code. This may be the result of this "inclusive date intervals" logic you insist on, and if you've proven it it certainly is coherent and right, I've not read your proof, but it is not what I needed at the time, and my logic seems coherent to me. But I don't get how you can say that these tests work for you. – Guillaume Deshors Feb 01 '21 at 09:20
-
Inclusive intervals inherently contain one or two days more than exclusive ones, depending on the definition of the interval. There are at least 3 ways to define an interval. 1) Fully exclusive. There are 3 days (TU, WE, TH) between Monday and Friday. 2) Semi-inclusive. There are 4 days (MO, TU, WE, TH or TU, WE, TH, FR) 3) Fully inclusive There are 5 days. The implementation I've provided is fully inclusive so test expectations need to be changed accordingly. If you need different intervals, let me know which one. The nice thing about this algorithm is that it completes in constant time. – Amir Kadić Feb 02 '21 at 19:02
-
I see, so these tests I wrote would be qualified semi-inclusive, I guess. And that's probably the root cause for misunderstanding along this thread, the problem wasn't specified enough. – Guillaume Deshors Feb 03 '21 at 12:33
-
Yes, the original problem is insufficiently specified. I've added examples of how to work with all 4 types of intervals to my answer. Most of your test cases work for semi-inclusive intervals that skip the last day but the cases #4 and #5 (the ones that end on a weekend) expect that the first day of the interval is skipped or both the first and the last day - otherwise you'd have to expect 3 working days, not 2. This inconsistency may be the sign of a bug. Does your implementation still work when you consistently use the same kind of interval? – Amir Kadić Feb 03 '21 at 18:16
This is my example without looping. Algorithm is same as 卢声远 Shengyuan Lus one but I used some features of JodaTime.
public static int getNumberOfBusinessDays(@Nonnull LocalDate from, @Nonnull LocalDate to) {
int fromDateDayOfWeek = from.getDayOfWeek();
int toDateDayOfWeek = to.getDayOfWeek();
int daysWithoutWeekends = 5 * Weeks.weeksBetween(
from.withDayOfWeek(DateTimeConstants.MONDAY), to).getWeeks();
if (fromDateDayOfWeek == DateTimeConstants.SUNDAY) {
fromDateDayOfWeek = DateTimeConstants.SATURDAY;
}
if (toDateDayOfWeek == DateTimeConstants.SUNDAY) {
toDateDayOfWeek = DateTimeConstants.SATURDAY;
}
return daysWithoutWeekends - (fromDateDayOfWeek - toDateDayOfWeek);
}
I don't have a Java based solution, but have a PHP one, hope it helps:
function getDate($days) {
for ($i = 0; $i < $days; $i ++) {
if (date('N' , strtotime('+' . ($i + 1) . ' days')) > 5) {
$days++;
}
}
return date('l, F jS', strtotime('+' . $days . ' days', time()));
}

- 3,150
- 23
- 23
-
1Generally expected that you post in the same language as the Question, or something close such as Groovy <-> Java. – Basil Bourque Jun 25 '18 at 20:46
The do
while
in the solution of Piyush is wrong, it should be :
do {
if (startCal.get(Calendar.DAY_OF_WEEK) != Calendar.SATURDAY && startCal.get(Calendar.DAY_OF_WEEK) != Calendar.SUNDAY) {
++workDays;
}
startCal.add(Calendar.DAY_OF_MONTH, 1);
} while (startCal.getTimeInMillis() < endCal.getTimeInMillis());

- 101
- 1
- 3
The startCal.add
should add onto the Calendar.DATE
field, not the Calendar.DAY_OF_MONTH
, I was getting weird results with over Decemeber / January period.

- 2,584
- 20
- 34
-
I don't think that's true, Calendar.DATE is a synonym for Calendar.DAY_OF_MONTH – mbosecke Apr 02 '15 at 18:41
This is my example without looping. It is a class in this example because I serialize it in some JSON output. Basically I work out the number of days between the two dates, divide by 7 and assign to a long to have a integer value for the number of weeks. Take the original number of days and subtract the number of weekends*2. This isn't quite perfect - you need to work out if there is a 'hangover' where the start is close to the end of the week and goes over the weekend. To correct for this I find the day of the week at the start and find the remainder of the number of days, and add those together to find the 'hangover' - and if it is more than 5 it is a weekend. It isn't quite perfect, and does not account for holidays at all. And no Joda in sight. That said there is also a issue with timezones.
import java.io.Serializable;
import java.util.Date;
public class BusinessDayCalculator implements Serializable {
private static long DAY = 86400000l;
private Date startTime;
private Date endTime;
public void setStartTime(Date startTime) {
this.startTime = startTime;
}
public Date getStartTime() {
return startTime;
}
public void setEndTime(Date endTime) {
this.endTime = endTime;
}
public Date getEndTime() {
return endTime;
}
public long getHours() {
return (this.endTime.getTime() - this.startTime.getTime())/(1000*60*60);
}
public long getBusinessDays(){
long startDay = getDayFromDate(this.startTime);
long endDay = getDayFromDate(this.endTime);
long totalDays = endDay-startDay;
long totalWeekends = totalDays/7;
long day = getDay(this.startTime);
long hangover = totalDays % 7;
long intoWeekend = day + hangover;
if(intoWeekend>5){
totalWeekends++;
}
long totalBusinessDays = totalDays - (totalWeekends *2);
/*
System.out.println("Days = " + day );
System.out.println("Hangover = " + hangover );
System.out.println("Total Days = " + totalDays);
System.out.println("Total Weekends = " + totalWeekends);
System.out.println("Total Business Days = " + totalBusinessDays);
*/
return totalBusinessDays;
}
private long getDayFromDate( Date date ){
long d = date.getTime() / DAY;
return d;
}
private long getDay( Date date ){
long daysSinceEpoc = getDayFromDate(date);
long day = daysSinceEpoc % 7;
day = day + 4;
if(day>6) day = day - 7;
return day;
}
}

- 11
- 1
-
This code is very error prone. You don't take leap seconds, leap years, etc into consideration. I would suggest you remove this answer, there are good libraries out there for Java (i.e. JodaTime) that get this right. Nice try though :-) – Daniel Langdon Aug 06 '15 at 23:19
-
Solution for Java 8 without loop and INCLUSIVE intervals:
public long getDaysWithoutSundays(LocalDate startDate, LocalDate endDate) {
long numberOfDays = ChronoUnit.DAYS.between(startDate, endDate) + 1;
long numberOfSundays = numberOfDays / 7;
long rest = numberOfDays % 7;
if (rest > 0) {
int startToEnd = startDate.getDayOfWeek().getValue() - endDate.getDayOfWeek().getValue();
if (startToEnd > 0) {
numberOfSundays++;
}
else {
if (endDate.getDayOfWeek().equals(DayOfWeek.SUNDAY)) {
numberOfSundays++;
}
}
}
return numberOfDays - numberOfSundays;
}

- 1,211
- 1
- 15
- 19
import java.util.ArrayList;
import java.util.Calendar;
import java.util.Date;
import java.util.HashMap;
import java.util.List;
/**
*
* @author varun.vishwakarma
*
*/
public class FindWeekendsInDateRange {
static HashMap<Integer, String> daysOfWeek=null;
static {
daysOfWeek = new HashMap<Integer, String>();
daysOfWeek.put(new Integer(1), "Sun");
daysOfWeek.put(new Integer(2), "Mon");
daysOfWeek.put(new Integer(3), "Tue");
daysOfWeek.put(new Integer(4), "Wed");
daysOfWeek.put(new Integer(5), "Thu");
daysOfWeek.put(new Integer(6), "Fri");
daysOfWeek.put(new Integer(7), "Sat");
}
/**
*
* @param from_date
* @param to_date
* @return
*/
public static List<Date> calculateWeekendsInDateReange(Date fromDate, Date toDate) {
List<Date> listOfWeekends = new ArrayList<Date>();
Calendar from = Calendar.getInstance();
Calendar to = Calendar.getInstance();
from.setTime(fromDate);
to.setTime(toDate);
while (from.getTimeInMillis() < to.getTimeInMillis()) {
if (daysOfWeek.get(from.get(Calendar.DAY_OF_WEEK)) == "Sat") {
Date sat = from.getTime();
listOfWeekends.add(sat);
} else if (daysOfWeek.get(from.get(Calendar.DAY_OF_WEEK)) == "Sun") {
Date sun = from.getTime();
listOfWeekends.add(sun);
}
from.add(Calendar.DAY_OF_MONTH, 1);
}
return listOfWeekends;
}
public static void main(String[] args) {
String fromDate = "7-Oct-2019";
String toDate = "25-Oct-2019";
System.out.println(FindWeekendsInDateRange.calculateWeekendsInDateReange(new Date(fromDate), new Date(toDate)));
}
}

- 4,342
- 19
- 84
- 119
I'm surprised that every solution given here fails to account for business holidays, which occur in most countries every few months at least, so any span more than a few months will give an incorrect answer. Fortunately, Ravindra's answer using Streams is, despite the inconsequential (for spans under ~10 years) overhead, the best one because it is trivial to correct:
import java.time.*;
import java.util.*;
import static java.time.temporal.ChronoUnit.DAYS;
public class WeekDaysLeft {
public static void main(String[] args) {
LocalDate startDate = LocalDate.now(); // Early 2023
LocalDate endDate = LocalDate.of(2023, 6, 23);
Set<DayOfWeek> weekendDays =
EnumSet.of(DayOfWeek.SATURDAY, DayOfWeek.SUNDAY);
Set<LocalDate> holidays =
Set.of(LocalDate.of(2023,4,7),
LocalDate.of(2023,4,10));
final long weekDaysBetween =
startDate.datesUntil(endDate)
.filter(d -> !weekendDays.contains(
d.getDayOfWeek()))
.filter(d -> !holidays.contains(d))
.count();
System.out.println(weekDaysBetween);
}
}
In regard to my claim that the overhead is inconsequential:
- Run my solution under time(1) on Unix/Linux e.g., time java WeekDaysLeft.java
- Change the end-date to 2033, and repeat step 1. On my system, the user time went DOWN slightly (user time up trivially). And, of course, if you're running this after June, 2023, bump all the years given.

- 607
- 4
- 19
This program considers loop approach but consider activities happened on after work hours to next working day office start hour
public class BusinessDayCalculator {
private final String DATE_FORMAT = "dd/MM/yyyy HH:mm:ss";
private final int OFFICE_START_HOUR = 9;
private final int OFFICE_CLOSE_HOUR = 17;
private final int TOTAL_MINS_IN_BUSINESS_DAY = (OFFICE_CLOSE_HOUR - OFFICE_START_HOUR)*60;
public void dateDifference(String start, String end){
Date startDate = validateStringToDate(start);
Date endDate = validateStringToDate(end);
System.out.println(startDate);
System.out.println(endDate);
Calendar startDay = convertDateToCalendar(startDate);
Calendar tempDay = (Calendar) startDay.clone();
Calendar endDay = convertDateToCalendar(endDate);
System.out.println(startDay.getTime());
System.out.println(endDay.getTime());
int workDays = -1;
int startDayDifference = 0;
int endDayDifference = 0;
int hours = 0;
int minsRemainder = 0;
if(!(startDay.get(Calendar.DAY_OF_YEAR) == endDay.get(Calendar.DAY_OF_YEAR)
&& startDay.get(Calendar.YEAR) == endDay.get(Calendar.YEAR))){
do{
tempDay.add(Calendar.DAY_OF_MONTH, 1);
if(tempDay.get(Calendar.DAY_OF_WEEK) != Calendar.SATURDAY
&& tempDay.get(Calendar.DAY_OF_WEEK) != Calendar.SUNDAY){
workDays++;
}
}while(tempDay.getTimeInMillis() <= endDay.getTimeInMillis());
if(workDays > 0){
workDays = workDays - 1;
}
}
startDayDifference = hourDifferenceInMinutesOfStartDay(startDay);
endDayDifference = hourDifferenceInMinutesOfEndDay(endDay);
minsRemainder = (startDayDifference + endDayDifference) % TOTAL_MINS_IN_BUSINESS_DAY;
workDays = workDays + ((startDayDifference + endDayDifference) / TOTAL_MINS_IN_BUSINESS_DAY);
hours = minsRemainder/60;
minsRemainder = minsRemainder % 60;
System.out.println(workDays + "d "+ hours + "hrs " + minsRemainder + " mins");
}
private int hourDifferenceInMinutesOfEndDay(Calendar endDay) {
long endTimestamp = endDay.getTimeInMillis();
System.out.println(endTimestamp);
endDay.set(Calendar.HOUR_OF_DAY, OFFICE_START_HOUR);
endDay.set(Calendar.MINUTE,0);
long endDayOfficeStartTimestamp = endDay.getTimeInMillis();
System.out.println(endDayOfficeStartTimestamp);
int difference = (int)((endTimestamp - endDayOfficeStartTimestamp) / 1000) / 60;
System.out.println(difference);
return difference;
}
private int hourDifferenceInMinutesOfStartDay(Calendar startDay) {
long starttimestamp = startDay.getTimeInMillis();
System.out.println(starttimestamp);
startDay.set(Calendar.HOUR_OF_DAY, OFFICE_CLOSE_HOUR);
startDay.set(Calendar.MINUTE,0);
long startDayOfficeCloseTimestamp = startDay.getTimeInMillis();
System.out.println(startDayOfficeCloseTimestamp);
int difference = (int)((startDayOfficeCloseTimestamp - starttimestamp) / 1000) / 60;
System.out.println(difference);
return difference;
}
public Calendar convertDateToCalendar(Date date){
Calendar calendar = Calendar.getInstance();
calendar.setTime(date);
if(calendar.get(Calendar.DAY_OF_WEEK) == Calendar.SATURDAY
|| calendar.get(Calendar.DAY_OF_WEEK) == Calendar.SUNDAY){
calendar = handleActivityOnAfterWorkHoursOrWeekendOrHolidays(calendar);
}
if(calendar.get(Calendar.HOUR_OF_DAY) >= OFFICE_CLOSE_HOUR
&& calendar.get(Calendar.MINUTE) > 0){
calendar = handleActivityOnAfterWorkHoursOrWeekendOrHolidays(calendar);
}
if(calendar.get(Calendar.HOUR_OF_DAY) < OFFICE_START_HOUR){
calendar.set(Calendar.HOUR_OF_DAY, OFFICE_START_HOUR);
calendar.set(Calendar.MINUTE,0);
}
return calendar;
}
private Calendar handleActivityOnAfterWorkHoursOrWeekendOrHolidays(Calendar calendar) {
do{
calendar.add(Calendar.DAY_OF_MONTH, 1);
}while(isHoliday(calendar));
calendar.set(Calendar.HOUR_OF_DAY, OFFICE_START_HOUR);
calendar.set(Calendar.MINUTE,0);
return calendar;
}
private boolean isHoliday(Calendar calendar) {
if(calendar.get(Calendar.DAY_OF_WEEK) == Calendar.SATURDAY
|| calendar.get(Calendar.DAY_OF_WEEK) == Calendar.SUNDAY){
return true;
}
return false;
}
public Date validateStringToDate(String input){
SimpleDateFormat dateFormat = new SimpleDateFormat(DATE_FORMAT);
Date date = null;
try{
date = dateFormat.parse(input);
}catch(ParseException exception){
System.out.println("invalid date format");
throw new RuntimeException("invalid date format");
}
return date;
}
public static void main(String[] args){
BusinessDayCalculator calc = new BusinessDayCalculator();
String startDate = "27/12/2016 11:38:00";
String endDate = "04/01/2017 12:38:00";
calc.dateDifference(startDate, endDate);
}
}

- 193
- 1
- 2
- 9
Here is a set-based solution that completes in constant time for any given subset of weekdays, not just Monday-Friday. It splits the problem into counting full weeks and counting the days in the residual week. If you are interested, here's a detailed explanation and a formal proof that the algorithm is correct. Note that the intervals are inclusive, i.e. startDate and endDate are counted in. If startDate is after endDate, the result is zero rather than negative.
long countWeekDays(LocalDate startDate, LocalDate endDate, Set<DayOfWeek> daysOfWeek) {
long periodLength = Math.max(0, ChronoUnit.DAYS.between(startDate, endDate) + 1);
long fullWeeks = periodLength / 7;
long residualWeekLength = periodLength % 7;
Set<DayOfWeek> residualWeekDays = LongStream.range(0, residualWeekLength)
.mapToObj(offset -> startDate.plusDays(offset).getDayOfWeek())
.collect(Collectors.toSet());
residualWeekDays.retainAll(daysOfWeek);
return fullWeeks * daysOfWeek.size() + residualWeekDays.size();
}
For the original problem (Monday-Friday) it is called e.g. with:
countWeekDays(
LocalDate.of(2016, 2, 8),
LocalDate.of(2016, 2, 26),
new HashSet(Arrays.asList(
DayOfWeek.MONDAY,
DayOfWeek.TUESDAY,
DayOfWeek.WEDNESDAY,
DayOfWeek.THURSDAY,
DayOfWeek.FRIDAY
)
)
)
This assumes you are working with inclusive intervals. If you want to skip the first day of the interval, just add one day to the first parameter:
countWeekDays(
LocalDate.of(2016, 2, 8).plusDays(1),
LocalDate.of(2016, 2, 26),
new HashSet(Arrays.asList(
DayOfWeek.MONDAY,
DayOfWeek.TUESDAY,
DayOfWeek.WEDNESDAY,
DayOfWeek.THURSDAY,
DayOfWeek.FRIDAY
)
)
)
Likewise, if you want to skip the last day of the inclusive interval, subtract one day from the second parameter:
countWeekDays(
LocalDate.of(2016, 2, 8),
LocalDate.of(2016, 2, 26).minusDays(1),
new HashSet(Arrays.asList(
DayOfWeek.MONDAY,
DayOfWeek.TUESDAY,
DayOfWeek.WEDNESDAY,
DayOfWeek.THURSDAY,
DayOfWeek.FRIDAY
)
)
)
Finally, if you need to skip both interval-delimiting days, combine the two previous modifications:
countWeekDays(
LocalDate.of(2016, 2, 8).plusDays(1),
LocalDate.of(2016, 2, 26).minusDays(1),
new HashSet(Arrays.asList(
DayOfWeek.MONDAY,
DayOfWeek.TUESDAY,
DayOfWeek.WEDNESDAY,
DayOfWeek.THURSDAY,
DayOfWeek.FRIDAY
)
)
)

- 81
- 4
In groovy:
public static int getWorkingDaysBetweenDates (Date start, Date end) {
def totalDays = (Integer) (end.getTime() - start.getTime()) / (1000 * 60 * 60 * 24)
def int workingDays = 0
(0..totalDays).each { def dow = (start + it)[Calendar.DAY_OF_WEEK]; if(dow != Calendar.SATURDAY && dow != Calendar.SUNDAY){workingDays++} }
workingDays
}

- 7,619
- 1
- 30
- 51
Using java 8
it can be easily done, example function:
long getBusinessDaysDifference(LocalDate startDate, LocalDate endDate) {
EnumSet<DayOfWeek> weekend = EnumSet.of(DayOfWeek.SATURDAY, DayOfWeek.SUNDAY);
List<LocalDate> list = Lists.newArrayList();
LocalDate start = startDate;
while (start.isBefore(endDate)) {
list.add(start);
start = start.plus(1, ChronoUnit.DAYS);
}
long numberOfDays = list.stream().filter(d -> !weekend.contains(d.getDayOfWeek())).count();
return numberOfDays;
}
Description:
- Define your
off-days
in anEnumSet
(weekends in this case). - Create a list holding all the days between the startDate and endDate.
- Reduce the outcome list by removing any occurrence of a day from the
EnumSet
. - Then finally count the size of this reduced list.
Note: this function can be optimized, but might be helpful as a starting point.

- 8,815
- 5
- 34
- 45
public long getNumberOfWeekDayBetweenDates(LocalDate startDate, LocalDate endDate, String dayOfWeek) {
long result = -1;
if (startDate != null && endDate != null && dayOfWeek != null && (startDate.isBefore(endDate) || startDate.isEqual(endDate))) {
java.time.DayOfWeek givenDayOfWeek = java.time.DayOfWeek.valueOf(dayOfWeek);
// find the first given day of week in the interval
LocalDate firstOccurrence = startDate.with(TemporalAdjusters.nextOrSame(givenDayOfWeek));
// similarly find last Monday
LocalDate lastOccurrence = endDate.with(TemporalAdjusters.previousOrSame(givenDayOfWeek));
if (firstOccurrence != null && lastOccurrence != null) {
// count the number of weeks between the first and last occurrence, then add 1 as end day is exclusive
result = ChronoUnit.WEEKS.between(firstOccurrence, lastOccurrence) + 1;
} else if (firstOccurrence == null && lastOccurrence == null) {
// no occurrence
result = 0;
} else {
result = 1;
}
}
return result;
}
For LocalDate
supported by latest java version you can try below function.
It provides support of functiongetDayOfWeek()
.
The getDayOfWeek()
method of LocalDate
class in Java gets the day-of-week field, which is an enum DayOfWeek.
public static int getWeekEndCount(LocalDate fromDate, LocalDate toDate) {
int saturday = 0;
int sunday = 0;
while (!fromDate.isAfter(toDate)) {
if (fromDate.getDayOfWeek().equals(DayOfWeek.SATURDAY))
saturday++;
else if (fromDate.getDayOfWeek().equals(DayOfWeek.SUNDAY))
sunday++;
fromDate = fromDate.plusDays(1);
}
System.out.println("Saturday count=="+saturday);
System.out.println("Sunday count=="+sunday);
return saturday+sunday;
}

- 7,544