12

What I would like to achieve is to have 2 tabs with custom code activities added automatically to the toolbox every time a new activity is created in any (workflow) project. Ideally this should be done through some code or installer.
I found a solution using the Visual Studio Integration Package but that one is not suitable for me (as it needs the SDK).

I have also tried using the IActivityToolboxService interface but that worked only for creating the tabs in the toolbox. And I was able to create them only if I (already) had access in toolbox to my custom activities.

Any other ideas are highly appreciated.

soumya
  • 3,801
  • 9
  • 35
  • 69
Lirima
  • 129
  • 3

0 Answers0