Questions tagged [ms-project-server-2010]

Microsoft Project Server - Project management system

Microsoft Project Server is a server based product from Microsoft for enterprise project management. It includes scheduling, resource management, task management, risk management, issue tracking, reporting, budget tracking and much more.

69 questions
3
votes
0 answers

PSI - Statusing Web Service - Results not as expected

I'm trying to update Status information on assignments via Statusing Web Service (PSI). Problem is, that the results are not as expected. I'll try to explain what I'm doing in detail: Two cases: 1) An assignment for the resource exists on specified…
bricaro
  • 31
  • 3
2
votes
1 answer

Project Server SSRS report - One report dynamically including multiple reports

I am not an expert at SSRS but have played around with it to know my basic way around it but I am stuck on this one. This is for Project Server 2010. I am working on a task to create two reports, and combine them at the end. First report, reportA is…
2
votes
2 answers

Connect MS Project 2010 to MS Project Server 2010

I am trying to get a tutorial or step by step instructions on how to connect MS Project 2010 to MS Project Server 2010. I have installed Server 2008 R2 (64 bit), Sharepoint 2010, and Project 2010 on my server and created a new site using the…
Nelson R
  • 21
  • 1
  • 3
2
votes
1 answer

How do you set multiple custom fields? - Microsoft Project Server

I’m fairly new to Project Server development and was wondering what modifications need to be made the following code I have to have it update multiple Custom Fields in one pass. I have everything working up until the point I want to start updating…
2
votes
0 answers

Committing changes to JSGrid control without writing to underlying database

I have a JSGrid Control which is being used to display timesheet data from an MS Project database. I want to add a "totals" row to the bottom each column of the grid which updates live on the client side and does not need to go back to the…
1
vote
0 answers

MS Project Server 2010, JS Grid OnSingleCellClick event not raised in IE9 if not in compatibility mode

We're using MS Project Server 2010 and within the timesheet-site, where users can capture working hours, we're attaching to the OnSingleCellClick event provided by the JS Grid on this web page. This works perfectly when the browser IE9 is used in…
1
vote
1 answer

Setting custom fields using the PSI - Microsoft Project Server

I'm new to Project Server development and was wondering if you can use the PSI to set resource custom field values. I can't seem to find any information for a beginner at this. I currently have web references set up for the CustomFields and the…
Mike
  • 312
  • 6
  • 18
1
vote
0 answers

How can I programmatically retrieve a list of project file names from Project Server?

I have a tool that needs to open Project files to get data out of them. Some of these project files are hosted on the Project Server site rather than a network location that can be browsed to with a normal file explorer. I know you can open files…
1
vote
0 answers

Is there a way to programmatically get a list of the different departments Enterprise Fields belong to?

As far as I know, Enterprise Fields can be setup in Project Server to belong to a particular Department. I believe this would make it so a certain profiles would have access to certain Enterprise fields only if they are part of the same department…
1
vote
1 answer

Is There a way to get a List of all the Enterprise Fields a user on Project Server has In Use?

I'm building a MS Project VSTO tool (written in C#) that in many instances needs to either read or write data from a field in MS Project. Since I don't always know what field will contain the data I need, I many times need to allow the user the…
1
vote
0 answers

Project Server PWA - locating a recalled timesheet

I have Project Web App database, and would like to identify Timesheets that have been recalled. Is the field or table or a join that would directly provide me this information?
tempidope
  • 823
  • 1
  • 12
  • 29
1
vote
1 answer

ms project : issue in wbs number reset

I have project schedule as below. I need start wbs from number 1 from kick-off meeting. Till Kick-off, I used customised wbs code, ie M1,M2,M3,M4. it is working. From from kick-off meeting on wards I need to start 1 1.1 1.2, 2, 2.1, 2.2 etc Existing…
1
vote
0 answers

how can I hide a ribbon item on project server 2010?

how can I hide a ribbon item (specifically Ribbon.ContextualTabs.ProjectCenter.Home.ChangeProjectType) on project server 2010? I followed this link and it hides a ribbon item I want to, but it affects the functionality of the other ribbon items in…
s.parvaneh
  • 11
  • 2
1
vote
4 answers

TFS 2010 with Project Server 2010

I've just tried out TFS 2010 today, along with Project 2010 and VS 2010. Only Later realized that without Sharepoint, TFS is only configured as Basic. This reduces it's functionality as oppose to what I've seen during VS2010 product launch. Sadly I…
faulty
  • 8,117
  • 12
  • 44
  • 61
1
vote
1 answer

Clearcase corrupting checked out Project files when changing network connection

Is anyone aware of a known issue (and workaround) where it seems like Rational ClearCase will corrupt a Microsoft Project file if it is checked out and the network connection changes? I have a laptop that is docked and hardwired to local network…
nikegolf05
  • 15
  • 2